Cafeteria Shingled Roof image

Cafeteria Shingled Roof

The east side of the cafeteria roof has brittle and missing tab shingles. It is time to replace these shingles and install a copper valley with the abutting hip. Pieces of the shingles have torn away and are falling on the lower flat roof. This Roof project was performed by Granite State Improvements in June of 2012

West Side Parking Lot Asphalt Resurfacing image

West Side Parking Lot Asphalt Resurfacing

Condition of existing parking lot. The parking lot has numerous areas with severe erosion. There are also 3 islands serving no purpose. These will be removed. The entire parking lot was repaired, paved and painted in July of 2012 by Bourassa Construction and Kaz Fine Lines

Gym HVAC Roof Top Unit image

Gym HVAC Roof Top Unit

The Gym HVAC RTU was in desperate need of replacing the exterior insulation. The unit was deteriorating with tears, holes, moisture growth and missing silicone. The project was performed by Amherst Insulation & Firestop Service, Inc in July 2009.

Repainting The Brick & Block image

Repainting The Brick & Block

Over the years, the exterior structure was showing signs of aging. Many window sills had lost their mortar causing wide cavities allowing moisture to penetrate the facility. Many areas had cracked or missing grout between the brick and concrete blocks. Some areas had mold and mildew growth due to exposed moisture. The majority of the schools foundation was cracked and decaying. Service was performed by P&G Masonry

Roof Replacement - L Shaped Room (2008) image

Roof Replacement - L Shaped Room (2008)

L Shaped Roof was replaced in 2008 by Progressive Roofing, Inc. The rubber EPDM had numerous ponding and worn seams allowing moisture penetration into the school. The new product installed is a Sika Sarnafil and comes with a 20 year warranty. Warranty Expires: May 15, 2029

Earth Day & Expanded Irrigation 2011 image

Earth Day & Expanded Irrigation 2011

Earth Day 2011 was a very successful and productive day. Numerous activities were conducted with student and staff participation. After the completion of Earth Day the schools irrigation system was expanded to the front of the school to provide well pumped water to maintain the landscape on a scheduled program.

Other Small Projects Over The Years image

Other Small Projects Over The Years

Various projects and renovations performed over the past 4 years.

A Little Help From Our Friends image

A Little Help From Our Friends

The North Hampton Highway Department directed by Mr. John Hubbard has assisted the school is many ways over the years. They have removed fallen trees from our Challenge Course, repaired asphalt in our parking lot and playground area, relocated heavy snow piles to a safe location and they provide the school with salting the school parking lot during the winter months. Their assistance to the school helps us maintain a safe environment for all.

This site provides information using PDF, visit this link to download the Adobe Acrobat Reader DC software.